Kohler K-5293-7 Guida di Installazione Pagina 5

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 40
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 4
1. Prepare the Recess
NOTE: Be sure to provide adequate backing for the fasteners.
Determine the desired A dimension, as shown in the
roughing-in. Add 17 (43.2 cm) to the A dimension chosen. The
overall inside height dimension produced from this calculation is
needed in the next step.
Prepare a stud framing box at the chosen installation site. The
inside dimensions of the framed box must be 13 (33 cm) wide by
23 (58.4 cm) high. The distance between the top inside of the box
and the floor must be the dimension previously calculated.
Rough-in the supply and drain piping according to the
roughing-in.
Provide adequate backing for the fasteners.
Prepare and drill the stud framing for the cuspidor supply tube.
Route the cuspidor supply tube through the stud framing so that
the ground-joint fitting is on the drinking fountain side.
Position the cuspidor supply tube so that it protrudes evenly
from both ends of the stud framing.
13"
(33 cm)
23"
(58.4 cm)
Cuspidor
Supply Tube
Kohler Co. 5 105126-2-AB
Vedere la pagina 4
1 2 3 4 5 6 7 8 9 10 ... 39 40

Commenti su questo manuale

Nessun commento