Kohler K-1360-H2-0 Guida di Installazione Pagina 7

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 64
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 6
4. Secure the Whirlpool to the Stud Framing
Option for Integral Flange Models
Drill a small pilot hole through the nailing-in flange at each stud. Add shims between the nailing-in
flange and the studs as needed to eliminate gaps.
Nail 1/4” (6 mm) thick furring strips to the studs to shim out to the edge of the nailing-in flange.
Use #6 large-head galvanized nails to secure the nailing-in flange to the studs.
For tile ledge installations, size and install a pressure-treated wood batten along the nailing-in
flange. Pre-drill nail holes through the wood batten and nailing-in flange before securing with
galvanized nails.
Nail 1/4" (6 mm) furring
strips to the studs.
Drill a small pilot
hole through the
nailing-in flange.
Use #6 large-head galvanized
nails to secure to the studs.
Install a pressure-treated wood
batten along the nailing-in flange.
Stud Framing
Stud Framing
Kohler Co. 7 1022211-2-C
Vedere la pagina 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 63 64

Commenti su questo manuale

Nessun commento