Kohler K-2276-B11 Guida di Installazione Pagina 3

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 24
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 2
3
1010430-2-A
Kohler Co., Kohler, WI U.S.A.
Turn off the water supply to the faucet.
Open the faucet valves to relieve water pressure, then
disconnect the supply lines.
Disconnect the drain assembly, and remove the trap.
Remove the existing lavatory.
Fig. #6
Faucet
Drain Assembly
Supply Lines
Shut-Off valve
Cut the template on the cut-out line labeled “Self-Rimming
Cut-Out”.
Position the template on the countertop to ensure
clearance between the lavatory, faucet, and backsplash.
Verify cabinet clearance beneath the countertop.
Fig. #7
Use a pencil to trace the template on the countertop.
Re-check the clearance between the lavatory, faucet,
backsplash, and cabinet. Adjust the traced cut-out line
accordingly.
Mark the faucet and handle centerline on the countertop.
Cut out the opening by carefully following the pencil line.
Fig. #8
Template
Trace The Template
Cut-Out
Vedere la pagina 2
1 2 3 4 5 6 7 8 ... 23 24

Commenti su questo manuale

Nessun commento